I would like to thank you and your team on their performance on the high priority repairs to our stick tank. Of particular note are: - High level of safety performance under challenging conditions - Strong desire to resolve technical problems. It is so refreshing to be provided with options on technical solutions before any problems have been made known. - Ability to self manage with minimal supervision. Your teams have gelled well with our various site services which has vastly reduced the requirements for me to act as an interface - Resource flexibility demonstrated to good effect to allow us to meet our challenging timescales - Quality of repair works. High level of workmanship and pride demonstrated. Thanks once again and happy to work with you
23.09.2010: Tank Repair Work
Improvement Manager
I would like to point out that we were very impressed with Lee and his team’s performance during the thermal oil project. Thank you
06.11.2008: Thermal Oil Project
Shift Engineering Manager
Dear Mike & Steve I would like to thank you and your staff for giving up your Saturday evening and working through Sunday at very short notice, assisting us in repairing the Schenk Conveyor, the failure of which had brought our production to a standstill. Your assistance was much appreciated.
21.06.1999: Breakdown of Schenk Conveyor
Plant Engineer