• Home
  • About
      • Back
      • About Us
      • Health & Safety
      • Service Agreements
      • Quality
      • Customer Focused Culture
      • Contact Us
          • Back
          • Contact
          • Careers
          • Legals
              • Back
              • Privacy Policy
              • Terms of Site Use
              • Terms & Conditions
              • Cookie Policy
  • Services
      • Back
      • Installation & Commissioning
      • On-Site Services
      • Strip down & Removal
      • Design & Development
      • Repair & Refurbishing
      • Manufacturing
      • Turnkey Projects
  • Industries
      • Back
      • Steels & Metals
      • Chemical & Pharmaceutical
      • Fertilizer
      • Food & Beverage
      • Water & Waste
      • Construction Architecture
  • Testimonials
      • Back
      • Steel & Metals Sector
      • Chemical Sector
      • Fertilizer Sector
      • Food & Beverage Sector
      • Nuclear Sector
      • OEM Industry Sector
      • Water & Waste Industry Sector
  • News
  • Downloads

News Articles

G&G Wins Contractor Award

Normality is coming

Stay Alert and Safe Lives

Coronavirus (Covid-19) Announcement

G&G dip their 'toe in the water' in Boat Construction

Skid Mounted Thermal System by G&G

£FIVE Billion G&G TV Appearance

Happy New Year 2018

Steam & Condensate Pipework Installation

Tanker Load Platform

Pipework & Vessel Supply

Pipe work Manufacturing Specialists

Site Survey Service

Shutdown Services

‘The Cathedral of Sewage’ pre-WWII motor replacement

BMPCA membership

New Safety Tool-Box-Talks

Health & Safety Management

New Website Launched

Larger Workshop Facilities

Tanker Load Platform

GG tanker loading gantry1G&G has recently designed, manufactured and installed a tanker load platform and staircase for a major food manufacturing plant in the UK.

The platform was created so that it extended into the vehicle driveway, to vertically access the top of the tanker for loading food related materials. G&G also supplied and installed the connecting pipework to the platform from the primary storage tanks/facility located 200m away.

For further information about G&G's experience in the Food Industry, please see our testimonial section.

GG tanker loading lr

  1. Pipework & Vessel Supply
  2. Pipe work Manufacturing Specialists
  3. Site Survey Service
  4. Shutdown Services

Page 10 of 20

  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
© 2001 - 2025 G&G Engineering Mechanical Services Ltd.